T1 Development, King's Cross, London
iMS Access Services were tasked with the installation and fixing of the steelwork and EPDM (ethylene propylene diene monomer) weatherproofing, to the Flues.
|
The work was carried out via rope access technicians over the course of 5 weeks, Our highly trained operatives erected the steel structure level by level to reach the height of over 55 metres.
To ensure that the clean air act was met the flues were manufactured to this height. |
Do you need structural steelwork installed safely and efficiently, get in touch now: [email protected] or call us on +44(0)1709 523799
|